Skip to main content

APRIL 9 1998 MACH 2 - 1.65 AIR INJECTION FROM FLOOR SITE WITH VARIOUS 25 DEGREE MINIATURE WEDGE PROBE LOCATIONS 5 TO 5.5 INCHES INTO MACH 4.3 - 4.4 FLOW

Item Preview

SIMILAR ITEMS (based on metadata)